NORTH BROADWAY over HILLSIDE NORTH BROADWAY
Map
Coordinates:
+34.07000, -118.2316734°04'12" N, 118°13'54" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | NORTH BROADWAY over HILLSIDE NORTH BROADWAY |
| Structure number: | 53C1705 |
| Location: | 1.0 MI N OF U.S.-101 |
| Route classification: | Other Principal Arterial (Urban) [14] |
| Length of largest span: | 15.1 ft. [4.6 m] |
| Total length: | 483.9 ft. [147.5 m] |
| Roadway width between curbs: | 67.9 ft. [20.7 m] |
| Deck width edge-to-edge: | 12.1 ft. [3.7 m] |
| Owner: | City or Municipal Highway Agency [04] |
| Year built: | 1929 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | M 13.5 / H 15 [2] |
| Number of main spans: | 32 |
| Main spans material: | Concrete continuous [2] |
| Main spans design: | Slab [01] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Bituminous [6] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 25,100 [as of 2000] |
| Truck traffic: | 2% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 36.3 tons [33.0 metric tons] |
| Inventory rating: | 21.8 tons [19.8 metric tons] |
| Sufficiency rating: | 78.1 |
| Recommended work: | Bridge rehabilitation because of general structure deterioration or inadequate strength. [35] |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 23,900 [as of 1998] |
| Truck traffic: | 2% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 25.0 tons [22.7 metric tons] |
| Inventory rating: | 15.0 tons [13.6 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 62.2 |
| Recommended work: | Bridge rehabilitation because of general structure deterioration or inadequate strength. [35] |
| Estimated cost of work: | $4,319,000 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 23,900 [as of 1987] |
| Truck traffic: | 2% of total traffic |
| Deck condition: | Very Good [8 out of 9] |
| Superstructure condition: | Very Good [8 out of 9] |
| Substructure condition: | Very Good [8 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 30.9 tons [28.1 metric tons] |
| Inventory rating: | 18.6 tons [16.9 metric tons] |
| Sufficiency rating: | 79.3 |