SR 241 SB over SANTIAGO CREEK
Map
Coordinates:
+33.79444, -117.7322233°47'40" N, 117°43'56" W
Source: National Bridge Inventory (2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | SR 241 SB over SANTIAGO CREEK |
| Structure number: | 55 0823L |
| Location: | 12-ORA-241-33.7-RSM |
| Purpose: | Carries highway over waterway |
| Route classification: | Principal Arterial - Other Freeways or Expressways (Urban) [12] |
| Tolls: | Yes, on toll road [2] |
| Length of largest span: | 230.0 ft. [70.1 m] |
| Total length: | 1270.1 ft. [387.1 m] |
| Roadway width between curbs: | 55.8 ft. [17.0 m] |
| Deck width edge-to-edge: | 59.4 ft. [18.1 m] |
| Owner: | State Highway Agency [01] |
| Year built: | 1998 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18+Mod / HS 20+Mod [6] |
| Number of main spans: | 6 |
| Main spans material: | Prestressed concrete [5] |
| Main spans design: | Box beam or girders - Multiple [05] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Monolithic Concrete (concurrently placed with structural deck) [1] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 20,500 [as of 2000] |
| Truck traffic: | 2% of total traffic |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Very Good [8 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Channel protection: | Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8] |
| Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
| Operating rating: | 59.4 tons [54.0 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Sufficiency rating: | 98.1 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Very Good [8 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Pier/abutment protection: | Navigation protection not required [1] |
| Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
| Operating rating: | 59.4 tons [54.0 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Sufficiency rating: | 100.0 |