Share:

ROBINSON AVENUE over STATE ROUTE 163

Map 

Coordinates:
+32.74667, -117.15639
32°44'48" N, 117°09'23" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:ROBINSON AVENUE over STATE ROUTE 163
Structure number:57 0219
Location:11-SD-163-2.49-SD
Purpose:Carries highway and pedestrian walkway over highway
Route classification:Collector (Urban) [17]
Length of largest span:51.8 ft. [15.8 m]
Total length:184.1 ft. [56.1 m]
Roadway width between curbs:25.9 ft. [7.9 m]
Deck width edge-to-edge:36.4 ft. [11.1 m]
Vertical clearance below bridge:16.1 ft. [4.9 m]
Skew angle:16°
Owner:State Highway Agency [01]
Year built:1942
Historic significance:Bridge is eligible for the National Register of Historic Places [2]
Design load:MS 18 / HS 20 [5]
Number of main spans:4
Main spans material:Concrete continuous [2]
Main spans design:Tee beam [04]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:10,900 [as of 2000]
Truck traffic:1% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:62.4 tons [56.7 metric tons]
Inventory rating:37.7 tons [34.3 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:71.6
Recommended work:Bridge deck rehabilitation with only incidental widening. [36]
Estimated cost of work:$1,036,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:17,740 [as of 1998]
Truck traffic:1% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:62.8 tons [57.1 metric tons]
Inventory rating:36.9 tons [33.5 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:70.7
Recommended work:Bridge deck rehabilitation with only incidental widening. [36]
Estimated cost of work:$467,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:17,740 [as of 1991]
Truck traffic:1% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:62.4 tons [56.7 metric tons]
Inventory rating:36.6 tons [33.3 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:72.2
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$450,000