S5-KETTNER OFFRAMP over HANCOCK ST-S5 ON-RAMP

Map 

Coordinates:
+32.74139, -117.18139
32°44'29" N, 117°10'53" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:S5-KETTNER OFFRAMP over HANCOCK ST-S5 ON-RAMP
Structure number:57 0545K
Location:11-SD-005-R18.2-SD
Purpose:Carries highway over highway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:90.9 ft. [27.7 m]
Total length:270.0 ft. [82.3 m]
Roadway width between curbs:22.0 ft. [6.7 m]
Deck width edge-to-edge:25.9 ft. [7.9 m]
Vertical clearance below bridge:13.8 ft. [4.2 m]
Owner:State Highway Agency [01]
Year built:1967
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:3
Main spans material:Concrete continuous [2]
Main spans design:Box beam or girders - Multiple [05]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:3,400 [as of 1998]
Truck traffic:1% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:87.7 tons [79.7 metric tons]
Inventory rating:52.8 tons [48.0 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:73.6
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$1,100,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:3,400 [as of 1998]
Truck traffic:1% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Inventory rating:83.7 tons [76.1 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:74.6
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$1,170,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:3,400 [as of 1990]
Truck traffic:1% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Inventory rating:83.2 tons [75.6 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:76.7
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$472,000