Share:

W8-S805 CONNECTOR over I 8,CONNS,CAMINO DEL RIO

Map 

Coordinates:
+32.77167, -117.13000
32°46'18" N, 117°07'48" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:W8-S805 CONNECTOR over I 8,CONNS,CAMINO DEL RIO
Structure number:57 0721F
Location:11-SD-008-4.36-SD
Purpose:Carries highway overpass over highway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:124.0 ft. [37.8 m]
Total length:1421.0 ft. [433.1 m]
Roadway width between curbs:32.2 ft. [9.8 m]
Deck width edge-to-edge:34.1 ft. [10.4 m]
Vertical clearance above deck:17.1 ft. [5.2 m]
Vertical clearance below bridge:29.9 ft. [9.1 m]
Skew angle:99°
Owner:State Highway Agency [01]
Year built:1972
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Main span material:Prestressed concrete [5]
Main span design:Box beam or girders - Multiple [05]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:11,900 [as of 2003]
Truck traffic:8% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:76.8 tons [69.8 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:92.6

2000 Inspection 

Evaluation:Not applicable [N]

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:18,500 [as of 1988]
Truck traffic:8% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:76.2 tons [69.3 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:91.4