Share:

BROADMOOR VALLEY over HIDDEN CREEK

Map 

Coordinates:
+38.78047, -104.83157
38°46'50" N, 104°49'54" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:BROADMOOR VALLEY over HIDDEN CREEK
Structure number:CSG-G.21-04.96
Location:JUST SOUTH OF HIDDEN CREE
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Local (Urban) [19]
Length of largest span:12.1 ft. [3.7 m]
Total length:25.3 ft. [7.7 m]
Roadway width between curbs:48.2 ft. [14.7 m]
Deck width edge-to-edge:50.9 ft. [15.5 m]
Skew angle:
Owner:City or Municipal Highway Agency [04]
Year built:1975
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Number of main spans:2
Main spans material:Concrete [1]
Main spans design:Culvert [19]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:3,936 [as of 2004]
Truck traffic:2% of total traffic
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Culvert condition:Deterioration or initial disintegration, minor chloride contamination, cracking with some leaching, or spalls on concrete or masonry walls and slabs. Local minor scouring at curtain walls, wingwalls or pipes. Metal culverts have a smooth curvature, non-symmetrical shape, significant corrosion or moderate pitting. [6]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Operating rating:39.9 tons [36.3 metric tons]
Inventory rating:36.0 tons [32.7 metric tons]
Sufficiency rating:95.4

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:4,370 [as of 1998]
Truck traffic:2% of total traffic
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Culvert condition:No noticeable or noteworthy deficiencies which affect the condition of the culvert. Insignificant scrape marks caused by drift. [8]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:39.6 tons [36.0 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:94.3

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:2,094 [as of 1986]
Truck traffic:2% of total traffic
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Culvert condition:No noticeable or noteworthy deficiencies which affect the condition of the culvert. Insignificant scrape marks caused by drift. [8]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:39.6 tons [36.0 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:95.2