Share:

WOODMEN ROAD over RAILROAD

Map 

Coordinates:
+38.91059, -104.82342
38°54'38" N, 104°49'24" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:WOODMEN ROAD over RAILROAD
Structure number:CSG-G.65-15.50
Location:0.4 MI W OF I-25.
Purpose:Carries highway and pedestrian walkway over railroad
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:78.1 ft. [23.8 m]
Total length:85.0 ft. [25.9 m]
Roadway width between curbs:88.9 ft. [27.1 m]
Deck width edge-to-edge:101.4 ft. [30.9 m]
Vertical clearance below bridge:23.6 ft. [7.2 m]
Skew angle:12°
Owner:City or Municipal Highway Agency [04]
Year built:1987
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Main span material:Steel [3]
Main span design:Box Beam or girders - Single or Spread [06]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:28,158 [as of 2009]
Truck traffic:5% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:65.7 tons [59.7 metric tons]
Inventory rating:39.4 tons [35.8 metric tons]
Sufficiency rating:92.1

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:15,784 [as of 1998]
Truck traffic:5% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:64.4 tons [58.5 metric tons]
Inventory rating:38.6 tons [35.1 metric tons]
Sufficiency rating:95.6

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:17,314 [as of 1988]
Truck traffic:5% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:64.4 tons [58.5 metric tons]
Inventory rating:38.6 tons [35.1 metric tons]
Sufficiency rating:94.8