Share:

CIRCLE DR WB over FOUNTAIN CREEK

Map 

Coordinates:
+38.79714, -104.78653
38°47'50" N, 104°47'12" W
Source: National Bridge Inventory
Information not verified. Use at your own risk.

Facts 

Name:CIRCLE DR WB over FOUNTAIN CREEK
Structure number:CSG-I.61-06.13W
Location:0.5 MI E OF I-25
Purpose:Carries highway over waterway
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:62.3 ft. [19.0 m]
Total length:355.7 ft. [108.4 m]
Roadway width between curbs:29.9 ft. [9.1 m]
Deck width edge-to-edge:34.1 ft. [10.4 m]
Owner:City or Municipal Highway Agency [04]
Year built:1963
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:6
Main spans material:Steel [3]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

Latest Available Inspection: May 2014 

Status:Open, no restriction [A]
Average daily traffic:14,193 [as of 2013]
Truck traffic:3% of total traffic
Deck condition:Poor [4 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Poor [4 out of 9]
Structural appraisal:Meets minimum tolerable limits to be left in place as is [4]
Deck geometry appraisal:Meets minimum tolerable limits to be left in place as is [4]
Water adequacy appraisal:Equal to present desirable criteria [8]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Operating rating:54.3 tons [49.4 metric tons]
Inventory rating:32.6 tons [29.6 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:48.4
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$8,140,000

Previous Inspections 

DateSuff. ratingEvaluationDeckSuper.Sub.ADT
May 201448.4Structurally deficientPoorFairPoor14193
May 201261.9Structurally deficientPoorFairFair16757
May 201047.8Structurally deficientPoorFairPoor16757
March 200861.7Structurally deficientPoorFairFair18600