Share:

EB PLATTE AVE over SAND CREEK

Map 

Coordinates:
+38.83917, -104.72796
38°50'21" N, 104°43'41" W
Source: National Bridge Inventory (2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:EB PLATTE AVE over SAND CREEK
Structure number:CSG-L.56-08.97
Location:0.3 MI W OF POWERS BLVD
Purpose:Carries highway over waterway
Route classification:Principal Arterial - Other Freeways or Expressways (Urban) [12]
Length of largest span:48.9 ft. [14.9 m]
Total length:356.6 ft. [108.7 m]
Roadway width between curbs:29.9 ft. [9.1 m]
Deck width edge-to-edge:34.1 ft. [10.4 m]
Owner:City or Municipal Highway Agency [04]
Year built:1956
Year reconstructed:1968
Historic significance:Historical significance is not determinable at this time [4]
Design load:MS 18 / HS 20 [5]
Number of main spans:7
Main spans material:Concrete [1]
Main spans design:Tee beam [04]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:17,454 [as of 2009]
Truck traffic:6% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5]
Scour condition:Countermeasures have been installed to mitigate an existing problem with scour. [7]
Operating rating:40.3 tons [36.6 metric tons]
Inventory rating:24.1 tons [21.9 metric tons]
Sufficiency rating:67.4

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:14,242 [as of 1998]
Truck traffic:6% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Fair [5 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour conditions; field review indicates action is required. [4]
Operating rating:39.6 tons [36.0 metric tons]
Inventory rating:23.8 tons [21.6 metric tons]
Sufficiency rating:55.0
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$1,396,000