BANNOCK ST over CHERRY CREEK
Map
Coordinates:
+39.72984, -104.9909839°43'47" N, 104°59'28" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | BANNOCK ST over CHERRY CREEK |
| Structure number: | D-01-CC-168 |
| Location: | BANNOCK ST AT SPEER BLVD |
| Purpose: | Carries highway and pedestrian walkway over waterway |
| Route classification: | Collector (Urban) [17] |
| Length of largest span: | 80.1 ft. [24.4 m] |
| Total length: | 82.4 ft. [25.1 m] |
| Roadway width between curbs: | 36.1 ft. [11.0 m] |
| Deck width edge-to-edge: | 45.6 ft. [13.9 m] |
| Owner: | City or Municipal Highway Agency [04] |
| Year built: | 1989 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18 / HS 20 [5] |
| Main span material: | Prestressed concrete [5] |
| Main span design: | Box beam or girders - Multiple [05] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Bituminous [6] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 2,868 [as of 2008] |
| Truck traffic: | 4% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Very Good [8 out of 9] |
| Channel protection: | Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8] |
| Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
| Operating rating: | 83.5 tons [75.9 metric tons] |
| Inventory rating: | 50.1 tons [45.5 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 77.7 |
| Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
| Estimated cost of work: | $600,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 3,675 [as of 1998] |
| Truck traffic: | 4% of total traffic |
| Deck condition: | Very Good [8 out of 9] |
| Superstructure condition: | Very Good [8 out of 9] |
| Substructure condition: | Very Good [8 out of 9] |
| Channel protection: | Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8] |
| Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
| Operating rating: | 82.2 tons [74.7 metric tons] |
| Inventory rating: | 49.5 tons [45.0 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 77.6 |
| Recommended work: | Bridge rehabilitation because of general structure deterioration or inadequate strength. [35] |
| Estimated cost of work: | $664,000 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 1,649 [as of 1989] |
| Deck condition: | Very Good [8 out of 9] |
| Superstructure condition: | Very Good [8 out of 9] |
| Substructure condition: | Very Good [8 out of 9] |
| Channel protection: | Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8] |
| Scour condition: | Scour calculation/evaluation has not been made. [6] |
| Operating rating: | 70.3 tons [63.9 metric tons] |
| Inventory rating: | 45.5 tons [41.4 metric tons] |
| Sufficiency rating: | 78.0 |
| Recommended work: | Bridge rehabilitation because of general structure deterioration or inadequate strength. [35] |
| Estimated cost of work: | $514,000 |