FLORIDA AVE over SOUTH PLATTE RIVER

Map 

Coordinates:
+39.68913, -104.99972
39°41'21" N, 104°59'59" W
Source: National Bridge Inventory
Information not verified. Use at your own risk.

Facts 

Name:FLORIDA AVE over SOUTH PLATTE RIVER
Structure number:D-02-PR-250
Location:JUST E OF S PLATTE RIVER
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Minor Arterial (Urban) [16]
Length of largest span:78.1 ft. [23.8 m]
Total length:163.1 ft. [49.7 m]
Roadway width between curbs:47.9 ft. [14.6 m]
Deck width edge-to-edge:60.0 ft. [18.3 m]
Owner:City or Municipal Highway Agency [04]
Year built:1956
Historic significance:Historical significance is not determinable at this time [4]
Number of main spans:2
Main spans material:Prestressed concrete [5]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

Latest Available Inspection: October 2014 

Status:Open, no restriction [A]
Average daily traffic:6,774 [as of 2013]
Truck traffic:6% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Structural appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck geometry appraisal:Basically intolerable requiring high priority of replacement [2]
Water adequacy appraisal:Equal to present desirable criteria [8]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Countermeasures have been installed to mitigate an existing problem with scour. [7]
Operating rating:62.5 tons [56.8 metric tons]
Inventory rating:24.1 tons [21.9 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:64.9
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$1,493,000

Previous Inspections 

DateSuff. ratingEvaluationDeckSuper.Sub.ADT
October 201464.9Functionally obsoleteSatisfactoryGoodSatisfactory6774
October 201264.9Functionally obsoleteSatisfactoryGoodSatisfactory6774
October 201064.9Functionally obsoleteSatisfactoryGoodSatisfactory7166
September 200864.9Functionally obsoleteGoodGoodSatisfactory7166
October 200664.7Functionally obsoleteGoodGoodSatisfactory8652
August 200464.7Functionally obsoleteGoodGoodSatisfactory8652
October 200264.5Functionally obsoleteGoodGoodSatisfactory8652
September 200064.1Functionally obsoleteGoodGoodGood8828
November 199964.1Functionally obsoleteVery GoodGoodGood8828
November 199864.1Functionally obsoleteVery GoodGoodGood8828
March 199663.9Functionally obsoleteGoodGoodGood10179
November 199464.2Functionally obsoleteGoodGoodGood10179
December 199264.2Functionally obsoleteGoodGoodGood10179
October 199064.1Functionally obsoleteGoodGoodGood11608