Share:

UNION AVE WB over I-25

Map 

Coordinates:
+39.62855, -104.90449
39°37'43" N, 104°54'16" W
Source: National Bridge Inventory (2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:UNION AVE WB over I-25
Structure number:D-04-BOST-150
Location:UNION AVE OVER I-25
Purpose:Carries highway and pedestrian walkway over highway and railroad
Route classification:Minor Arterial (Urban) [16]
Length of largest span:208.0 ft. [63.4 m]
Total length:426.2 ft. [129.9 m]
Roadway width between curbs:27.9 ft. [8.5 m]
Deck width edge-to-edge:43.3 ft. [13.2 m]
Vertical clearance below bridge:19.0 ft. [5.8 m]
Skew angle:99°
Owner:City or Municipal Highway Agency [04]
Year built:1992
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:2
Main spans material:Steel continuous [4]
Main spans design:Box beam or girders - Multiple [05]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:2,917 [as of 2008]
Truck traffic:6% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:80.1 tons [72.8 metric tons]
Inventory rating:48.1 tons [43.7 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:78.6
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$2,975,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:2,949 [as of 1998]
Truck traffic:6% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:79.2 tons [72.0 metric tons]
Inventory rating:47.5 tons [43.2 metric tons]
Sufficiency rating:76.4
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$2,266,000