PRIVATE ACCESS RD over 15TH STREET
Map
Coordinates:
+39.75333, -105.0049739°45'12" N, 105°00'18" W
Source: National Bridge Inventory (2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | PRIVATE ACCESS RD over 15TH STREET |
| Structure number: | D-04-BOST-161 |
| Location: | 0.1 MI E OF LITTLE RAVEN |
| Purpose: | Carries highway over highway |
| Route classification: | Local (Urban) [19] |
| Length of largest span: | 40.0 ft. [12.2 m] |
| Total length: | 83.7 ft. [25.5 m] |
| Roadway width between curbs: | 14.4 ft. [4.4 m] |
| Deck width edge-to-edge: | 16.7 ft. [5.1 m] |
| Vertical clearance below bridge: | 16.7 ft. [5.1 m] |
| Skew angle: | 18° |
| Owner: | Railroad [27] |
| Year built: | 1992 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Number of main spans: | 2 |
| Main spans material: | Steel continuous [4] |
| Main spans design: | Stringer/Multi-beam or girder [02] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Monolithic Concrete (concurrently placed with structural deck) [1] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 1 [as of 2008] |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Very Good [8 out of 9] |
| Substructure condition: | Very Good [8 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 66.0 tons [60.0 metric tons] |
| Inventory rating: | 39.5 tons [35.9 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 79.3 |
| Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
| Estimated cost of work: | $274,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 9,486 [as of 1997] |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Very Good [8 out of 9] |
| Substructure condition: | Very Good [8 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 65.3 tons [59.4 metric tons] |
| Inventory rating: | 38.6 tons [35.1 metric tons] |
| Evaluation: | Not applicable [N] |
| Recommended work: | Bridge rehabilitation because of general structure deterioration or inadequate strength. [35] |
| Estimated cost of work: | $494,000 |