Share:

YALE AVE over HIGHLINE CANAL

Map 

Coordinates:
+39.66758, -104.91141
39°40'03" N, 104°54'41" W
Source: National Bridge Inventory (2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:YALE AVE over HIGHLINE CANAL
Structure number:D-10-HC-190
Location:YALE E OF MONACO PRKWY
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Minor Arterial (Urban) [16]
Length of largest span:41.0 ft. [12.5 m]
Total length:45.6 ft. [13.9 m]
Roadway width between curbs:44.0 ft. [13.4 m]
Deck width edge-to-edge:56.1 ft. [17.1 m]
Skew angle:32°
Owner:City or Municipal Highway Agency [04]
Year built:1964
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Main span material:Prestressed concrete [5]
Main span design:Tee beam [04]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:15,251 [as of 2008]
Truck traffic:6% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Fair [5 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour conditions; field review indicates action is required. [4]
Operating rating:36.7 tons [33.4 metric tons]
Inventory rating:22.0 tons [20.0 metric tons]
Sufficiency rating:53.0

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:18,113 [as of 1998]
Truck traffic:6% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Fair [5 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour conditions; field review indicates action is required. [4]
Operating rating:35.6 tons [32.4 metric tons]
Inventory rating:21.8 tons [19.8 metric tons]
Sufficiency rating:52.1