BELLEVIEW AVE over GOLDSMITH GULCH
Map
Coordinates:
+39.62428, -104.8891739°37'27" N, 104°53'21" W
Source: National Bridge Inventory (2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | BELLEVIEW AVE over GOLDSMITH GULCH |
| Structure number: | D-11-GG-200 |
| Location: | JUST E OF DTC BLVD |
| Purpose: | Carries highway and pedestrian walkway over waterway |
| Route classification: | Other Principal Arterial (Urban) [14] |
| Length of largest span: | 59.7 ft. [18.2 m] |
| Total length: | 63.7 ft. [19.4 m] |
| Roadway width between curbs: | 94.2 ft. [28.7 m] |
| Deck width edge-to-edge: | 123.0 ft. [37.5 m] |
| Skew angle: | 20° |
| Owner: | City or Municipal Highway Agency [04] |
| Year built: | 1986 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18 / HS 20 [5] |
| Main span material: | Concrete [1] |
| Main span design: | Frame [07] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Bituminous [6] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 20,620 [as of 2008] |
| Truck traffic: | 5% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Very Good [8 out of 9] |
| Channel protection: | Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8] |
| Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
| Operating rating: | 89.8 tons [81.6 metric tons] |
| Inventory rating: | 64.7 tons [58.8 metric tons] |
| Sufficiency rating: | 97.1 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 31,905 [as of 1998] |
| Truck traffic: | 5% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Very Good [8 out of 9] |
| Channel protection: | Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8] |
| Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
| Inventory rating: | 63.4 tons [57.6 metric tons] |
| Sufficiency rating: | 93.0 |