I 70 ML WBND over SAND CREEK
Map
Coordinates:
+39.77842, -104.9001239°46'42" N, 104°54'00" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | I 70 ML WBND over SAND CREEK |
| Structure number: | E-17-GE |
| Location: | DENVER |
| Purpose: | Carries highway over waterway |
| Route classification: | Principal Arterial - Interstate (Urban) [11] |
| Length of largest span: | 52.5 ft. [16.0 m] |
| Total length: | 336.0 ft. [102.4 m] |
| Roadway width between curbs: | 40.0 ft. [12.2 m] |
| Deck width edge-to-edge: | 44.0 ft. [13.4 m] |
| Skew angle: | 20° |
| Owner: | State Highway Agency [01] |
| Year built: | 1964 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18 / HS 20 [5] |
| Number of main spans: | 6 |
| Main spans material: | Concrete [1] |
| Main spans design: | Tee beam [04] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Bituminous [6] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 68,000 [as of 2007] |
| Truck traffic: | 9% of total traffic |
| Deck condition: | Fair [5 out of 9] |
| Superstructure condition: | Fair [5 out of 9] |
| Substructure condition: | Poor [4 out of 9] |
| Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
| Scour condition: | Bridge foundations determined to be stable for assessed or calculated scour condition. [5] |
| Operating rating: | 53.9 tons [49.0 metric tons] |
| Inventory rating: | 31.9 tons [29.0 metric tons] |
| Evaluation: | Structurally deficient [1] |
| Sufficiency rating: | 41.4 |
| Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
| Estimated cost of work: | $3,219,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 77,645 [as of 1997] |
| Truck traffic: | 11% of total traffic |
| Deck condition: | Fair [5 out of 9] |
| Superstructure condition: | Fair [5 out of 9] |
| Substructure condition: | Poor [4 out of 9] |
| Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
| Scour condition: | Bridge foundations determined to be stable for assessed or calculated scour condition. [5] |
| Operating rating: | 53.5 tons [48.6 metric tons] |
| Inventory rating: | 31.7 tons [28.8 metric tons] |
| Evaluation: | Structurally deficient [1] |
| Sufficiency rating: | 35.8 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 41,500 [as of 1988] |
| Truck traffic: | 9% of total traffic |
| Deck condition: | Fair [5 out of 9] |
| Superstructure condition: | Fair [5 out of 9] |
| Substructure condition: | Fair [5 out of 9] |
| Channel protection: | Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6] |
| Scour condition: | Bridge foundations determined to be stable for assessed or calculated scour condition. [5] |
| Operating rating: | 41.6 tons [37.8 metric tons] |
| Inventory rating: | 36.6 tons [33.3 metric tons] |
| Sufficiency rating: | 63.3 |
| Recommended work: | Bridge rehabilitation because of general structure deterioration or inadequate strength. [35] |
| Estimated cost of work: | $1,552,000 |