Share:

6THAVERMP TOI25 NB over RAMP TO 8TH AVE R

Map 

Coordinates:
+39.72931, -105.01479
39°43'46" N, 105°00'53" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:6THAVERMP TOI25 NB over RAMP TO 8TH AVE R
Structure number:F-16-OH
Location:IN DENVER
Purpose:Carries highway overpass over highway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:151.3 ft. [46.1 m]
Total length:628.0 ft. [191.4 m]
Roadway width between curbs:45.6 ft. [13.9 m]
Deck width edge-to-edge:48.6 ft. [14.8 m]
Vertical clearance below bridge:16.7 ft. [5.1 m]
Owner:State Highway Agency [01]
Year built:1988
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18+Mod / HS 20+Mod [6]
Number of main spans:5
Main spans material:Prestressed concrete continuous [6]
Main spans design:Box beam or girders - Multiple [05]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:21,650 [as of 2005]
Truck traffic:6% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:69.9 tons [63.5 metric tons]
Inventory rating:41.9 tons [38.1 metric tons]
Sufficiency rating:87.7

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:26,600 [as of 1997]
Truck traffic:7% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:69.3 tons [63.0 metric tons]
Inventory rating:41.6 tons [37.8 metric tons]
Sufficiency rating:86.9

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:17,900 [as of 1988]
Truck traffic:9% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Excellent [9 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:35.6 tons [32.4 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:88.1