Share:

US 40 ML over CHERRY CREEK

Map 

Coordinates:
+39.74002, -104.99845
39°44'24" N, 104°59'54" W
Source: National Bridge Inventory (2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:US 40 ML over CHERRY CREEK
Structure number:F-16-TR
Location:COLFAX / DOWNTOWN DENVER
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:95.1 ft. [29.0 m]
Total length:103.0 ft. [31.4 m]
Roadway width between curbs:81.7 ft. [24.9 m]
Deck width edge-to-edge:135.5 ft. [41.3 m]
Skew angle:27°
Owner:State Highway Agency [01]
Year built:1999
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Main span material:Prestressed concrete [5]
Main span design:Box Beam or girders - Single or Spread [06]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:47,400 [as of 2008]
Truck traffic:4% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:73.9 tons [67.2 metric tons]
Inventory rating:43.9 tons [39.9 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:78.1

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:40,200 [as of 1997]
Truck traffic:2% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:73.3 tons [66.6 metric tons]
Inventory rating:43.6 tons [39.6 metric tons]
Sufficiency rating:76.1
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$1,235,000