Share:

SH 2 ML over HIGHLINE CANAL

Map 

Coordinates:
+39.65959, -104.94066
39°39'35" N, 104°56'26" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:SH 2 ML over HIGHLINE CANAL
Structure number:F-17-CG
Location:WELLSHIRE GOLF COURSE
Purpose:Carries highway over waterway
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:27.6 ft. [8.4 m]
Total length:29.2 ft. [8.9 m]
Roadway width between curbs:83.3 ft. [25.4 m]
Deck width edge-to-edge:95.1 ft. [29.0 m]
Skew angle:13°
Owner:State Highway Agency [01]
Year built:1958
Year reconstructed:1965
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Main span material:Concrete [1]
Main span design:Tee beam [04]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:24,700 [as of 2008]
Truck traffic:3% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:56.3 tons [51.2 metric tons]
Inventory rating:33.8 tons [30.7 metric tons]
Sufficiency rating:90.4

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:22,900 [as of 1997]
Truck traffic:3% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:53.5 tons [48.6 metric tons]
Inventory rating:31.7 tons [28.8 metric tons]
Sufficiency rating:88.2

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:23,000 [as of 1988]
Truck traffic:3% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:44.6 tons [40.5 metric tons]
Inventory rating:25.7 tons [23.4 metric tons]
Sufficiency rating:80.3