Share:

7th Street over Roaring Fork River

Map 

Coordinates:
+39.54684, -107.33053
39°32'49" N, 107°19'50" W
Source: National Bridge Inventory
Information not verified. Use at your own risk.

Facts 

Name:7th Street over Roaring Fork River
Structure number:GLNWD-7A
Location:4 Bl. W. of Pine Street
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Minor Collector (Rural) [08]
Length of largest span:98.1 ft. [29.9 m]
Total length:198.5 ft. [60.5 m]
Roadway width between curbs:25.9 ft. [7.9 m]
Deck width edge-to-edge:44.6 ft. [13.6 m]
Owner:City or Municipal Highway Agency [04]
Year built:1991
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:3
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

Latest Available Inspection: November 2015 

Status:Open, no restriction [A]
Average daily traffic:8,536 [as of 2012]
Truck traffic:2% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Structural appraisal:Better than present minimum criteria [7]
Deck geometry appraisal:Basically intolerable requiring high priority of corrrective action [3]
Water adequacy appraisal:Equal to present desirable criteria [8]
Roadway alignment appraisal:Equal to present minimum criteria [6]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Operating rating:72.2 tons [65.6 metric tons]
Inventory rating:43.3 tons [39.4 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:76.4
Recommended work:Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Estimated cost of work:$1,123,000

Previous Inspections 

DateSuff. ratingEvaluationDeckSuper.Sub.ADT
November 201576.4Functionally obsoleteGoodGoodGood8536
November 201376.4Functionally obsoleteGoodGoodGood8536
October 201176.4Functionally obsoleteGoodGoodGood8536
October 200976.4Functionally obsoleteGoodGoodGood8536
October 200776.4Functionally obsoleteGoodGoodGood8536
August 200576.3Functionally obsoleteGoodGoodGood5599
October 200396.6Not deficientGoodGoodGood5939
June 200196.6Not deficientGoodGoodGood5939
200094.6Not deficientGoodGoodGood5939
August 199794.6Not deficientGoodGoodGood5939
September 199597.6Not deficientGoodGoodGood1995
August 199399.6Not deficientGoodVery GoodVery Good1995
September 199199.6Not deficientVery GoodGoodGood1995