I 25 ML NBND over ELLSTON ROAD

Map 

Coordinates:
+38.88434, -104.83558
38°53'04" N, 104°50'08" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:I 25 ML NBND over ELLSTON ROAD
Structure number:I-17-DP
Location:IN COLORADO SPRINGS
Purpose:Carries highway over highway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:61.0 ft. [18.6 m]
Total length:154.9 ft. [47.2 m]
Roadway width between curbs:43.0 ft. [13.1 m]
Deck width edge-to-edge:46.6 ft. [14.2 m]
Vertical clearance below bridge:21.7 ft. [6.6 m]
Owner:State Highway Agency [01]
Year built:1959
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:3
Main spans material:Concrete continuous [2]
Main spans design:Tee beam [04]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:52,500 [as of 2007]
Truck traffic:7% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:49.0 tons [44.5 metric tons]
Inventory rating:29.9 tons [27.2 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:69.7
Recommended work:Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Estimated cost of work:$285,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:49,439 [as of 1997]
Truck traffic:5% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:48.5 tons [44.1 metric tons]
Inventory rating:29.7 tons [27.0 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:63.3
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$327,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:28,800 [as of 1988]
Truck traffic:6% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:42.6 tons [38.7 metric tons]
Inventory rating:32.7 tons [29.7 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:68.5