Facts 

Name:I 25 SERVICE RD over PINE CREEK SR
Structure number:I-17-O
Location:1.4 MI N OF JCT I-25 BUS
Purpose:Carries highway over waterway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:73.5 ft. [22.4 m]
Total length:188.7 ft. [57.5 m]
Roadway width between curbs:27.9 ft. [8.5 m]
Deck width edge-to-edge:32.2 ft. [9.8 m]
Owner:State Highway Agency [01]
Year built:1960
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 13.5 / H 15 [2]
Number of main spans:3
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

Latest Available Inspection: August 2014 

Status:Open, no restriction [A]
Average daily traffic:1,068 [as of 2013]
Truck traffic:10% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Fair [5 out of 9]
Structural appraisal:Meets minimum tolerable limits to be left in place as is [4]
Deck geometry appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Water adequacy appraisal:Equal to present desirable criteria [8]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Operating rating:33.7 tons [30.6 metric tons]
Inventory rating:20.1 tons [18.3 metric tons]
Sufficiency rating:46.3
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$653,000

Previous Inspections 

DateSuff. ratingEvaluationDeckSuper.Sub.ADT
August 201446.3Not deficientFairSatisfactoryFair1068
August 201235.8Functionally obsoleteFairSatisfactoryFair8310
August 201046.0Functionally obsoleteFairSatisfactoryFair8310
September 200853.6Functionally obsoleteFairSatisfactorySatisfactory8310
September 200653.6Functionally obsoleteFairSatisfactorySatisfactory8310
August 200458.0Functionally obsoleteFairSatisfactorySatisfactory7472
September 200057.7Functionally obsoleteFairSatisfactorySatisfactory7274
September 199857.7Functionally obsoleteFairSatisfactorySatisfactory7274
August 199657.9Functionally obsoleteFairSatisfactorySatisfactory6440
October 199457.8Functionally obsoleteFairSatisfactorySatisfactory6440
September 199256.6Functionally obsoleteSatisfactorySatisfactorySatisfactory6000
August 199056.6Functionally obsoleteSatisfactoryGoodSatisfactory6000