Facts
| Name: | ROUTE 32 over SMITH COVE |
| Structure number: | 00924 |
| Location: | 1 MILE SOUTH OF SR 693 |
| Purpose: | Carries highway over waterway |
| Route classification: | Other Principal Arterial (Urban) [14] |
| Length of largest span: | 49.9 ft. [15.2 m] |
| Total length: | 53.2 ft. [16.2 m] |
| Roadway width between curbs: | 73.2 ft. [22.3 m] |
| Deck width edge-to-edge: | 78.4 ft. [23.9 m] |
| Owner: | State Highway Agency [01] |
| Year built: | 1940 |
| Year reconstructed: | 1998 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18 / HS 20 [5] |
| Main span material: | Prestressed concrete [5] |
| Main span design: | Box beam or girders - Multiple [05] |
| Deck type: | Other [9] |
| Wearing surface: | Bituminous [6] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 29,500 [as of 2007] |
| Truck traffic: | 6% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Channel protection: | Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6] |
| Scour condition: | Bridge foundations determined to be stable for assessed or calculated scour condition. [5] |
| Operating rating: | 73.7 tons [67.0 metric tons] |
| Inventory rating: | 36.9 tons [33.5 metric tons] |
| Sufficiency rating: | 95.2 |
| Recommended work: | Other structural work, including hydraulic replacements. [38] |
| Estimated cost of work: | $2,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 28,500 [as of 1997] |
| Truck traffic: | 4% of total traffic |
| Deck condition: | Very Good [8 out of 9] |
| Superstructure condition: | Very Good [8 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Channel protection: | Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6] |
| Scour condition: | Bridge foundations determined to be stable for assessed or calculated scour condition. [5] |
| Operating rating: | 68.3 tons [62.1 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Sufficiency rating: | 95.3 |
| Recommended work: | Other structural work, including hydraulic replacements. [38] |
| Estimated cost of work: | $2,000 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 26,200 [as of 1989] |
| Truck traffic: | 5% of total traffic |
| Deck condition: | Fair [5 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
| Scour condition: | Scour calculation/evaluation has not been made. [6] |
| Operating rating: | 49.5 tons [45.0 metric tons] |
| Inventory rating: | 26.7 tons [24.3 metric tons] |
| Sufficiency rating: | 76.5 |