Share:

JEFFERSON ST, N.W. over C&O CANAL

Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:JEFFERSON ST, N.W. over C&O CANAL
Structure number:0004
Location:GEORGETOWN & C&O CANAL
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Local (Urban) [19]
Length of largest span:20.0 ft. [6.1 m]
Total length:20.0 ft. [6.1 m]
Roadway width between curbs:20.3 ft. [6.2 m]
Deck width edge-to-edge:27.9 ft. [8.5 m]
Vertical clearance below bridge:9.8 ft. [3.0 m]
Owner:State Highway Agency [01]
Year reconstructed:1929
Historic significance:Bridge is eligible for the National Register of Historic Places [2]
Main span material:Steel [3]
Main span design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Posted for load [P]
Average daily traffic:1,000 [as of 2007]
Truck traffic:1% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Poor [4 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Pier/abutment protection:In place and functioning [2]
Scour condition:Bridge foundations (including piles) on dry land well above flood water elevations. [9]
Operating rating:35.0 tons [31.8 metric tons]
Inventory rating:15.0 tons [13.6 metric tons]
Evaluation:Not applicable [N]
Sufficiency rating:25.8
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,200,000

2000 Inspection 

Status:Posted for load [P]
Average daily traffic:500 [as of 1992]
Truck traffic:1% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Fair [5 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Pier/abutment protection:In place and functioning [2]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:57.9 tons [52.6 metric tons]
Inventory rating:15.0 tons [13.6 metric tons]
Evaluation:Not applicable [N]
Sufficiency rating:41.3
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,200,000

1992 Inspection 

Status:Posted for load [P]
Average daily traffic:500 [as of 1990]
Truck traffic:1% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Pier/abutment protection:In place and functioning [2]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:14.9 tons [13.5 metric tons]
Inventory rating:14.9 tons [13.5 metric tons]
Evaluation:Not applicable [N]
Sufficiency rating:41.1
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,200,000