N.RAMP TO BURR.AVE over WATTS BRANCH
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | N.RAMP TO BURR.AVE over WATTS BRANCH |
| Structure number: | 0019-1(LOW) |
| Location: | OVER WATTS BR, N.E. |
| Purpose: | Carries highway over waterway |
| Route classification: | Principal Arterial - Other Freeways or Expressways (Urban) [12] |
| Length of largest span: | 49.9 ft. [15.2 m] |
| Total length: | 53.2 ft. [16.2 m] |
| Roadway width between curbs: | 25.9 ft. [7.9 m] |
| Deck width edge-to-edge: | 36.1 ft. [11.0 m] |
| Owner: | State Highway Agency [01] |
| Year built: | 1956 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18 / HS 20 [5] |
| Main span material: | Steel [3] |
| Main span design: | Stringer/Multi-beam or girder [02] |
| Deck type: | Concrete Cast-in-Place [1] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 13,000 [as of 2007] |
| Truck traffic: | 2% of total traffic |
| Deck condition: | Poor [4 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Channel protection: | Bank and embankment protection is severely undermined. River control devices have severe damage. Large deposits of debris are in the channel. [4] |
| Scour condition: | Bridge foundations determined to be stable for assessed or calculated scour condition. [5] |
| Operating rating: | 86.8 tons [78.9 metric tons] |
| Inventory rating: | 51.9 tons [47.2 metric tons] |
| Evaluation: | Structurally deficient [1] |
| Sufficiency rating: | 76.0 |
| Recommended work: | Other structural work, including hydraulic replacements. [38] |
| Estimated cost of work: | $2,000,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 13,000 [as of 1992] |
| Truck traffic: | 2% of total traffic |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Channel protection: | Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5] |
| Scour condition: | Scour calculation/evaluation has not been made. [6] |
| Operating rating: | 86.8 tons [78.9 metric tons] |
| Inventory rating: | 51.9 tons [47.2 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 79.0 |
| Recommended work: | Other structural work, including hydraulic replacements. [38] |
| Estimated cost of work: | $2,000,000 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 13,000 [as of 1990] |
| Truck traffic: | 2% of total traffic |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Scour condition: | Scour calculation/evaluation has not been made. [6] |
| Operating rating: | 35.6 tons [32.4 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 78.0 |
| Recommended work: | Other structural work, including hydraulic replacements. [38] |
| Estimated cost of work: | $2,000,000 |