Facts 

Name:PARK ROAD, N.W. over PINEY BRANCH PKWY
Structure number:0025
Location:OVER PINEY BRANCH PKWY,NW
Purpose:Carries highway and pedestrian walkway over highway and waterway
Route classification:Minor Arterial (Urban) [16]
Length of largest span:206.0 ft. [62.8 m]
Total length:329.1 ft. [100.3 m]
Roadway width between curbs:38.1 ft. [11.6 m]
Deck width edge-to-edge:55.1 ft. [16.8 m]
Vertical clearance below bridge:37.1 ft. [11.3 m]
Owner:State Highway Agency [01]
Year built:1959
Year reconstructed:1999
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Main span material:Steel [3]
Main span design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:11,900 [as of 2007]
Truck traffic:1% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Operating rating:68.6 tons [62.4 metric tons]
Inventory rating:36.0 tons [32.7 metric tons]
Sufficiency rating:97.9
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$4,649,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:9,600 [as of 1992]
Truck traffic:1% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Very Good [8 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Operating rating:33.9 tons [30.8 metric tons]
Inventory rating:25.0 tons [22.7 metric tons]
Sufficiency rating:87.1
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$4,649,000

1992 Inspection 

Status:Posted for load [P]
Average daily traffic:9,600 [as of 1990]
Truck traffic:1% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Fair [5 out of 9]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:30.9 tons [28.1 metric tons]
Inventory rating:30.9 tons [28.1 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:62.8
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$4,649,000