Facts
| Name: | P STREET, N.W. over ROCK CREEK |
| Structure number: | 0034 |
| Location: | P ST.OVER ROCK CREEK |
| Purpose: | Carries highway and pedestrian walkway over highway and waterway |
| Route classification: | Minor Arterial (Urban) [16] |
| Length of largest span: | 109.9 ft. [33.5 m] |
| Total length: | 336.0 ft. [102.4 m] |
| Roadway width between curbs: | 40.0 ft. [12.2 m] |
| Deck width edge-to-edge: | 55.8 ft. [17.0 m] |
| Vertical clearance below bridge: | 13.1 ft. [4.0 m] |
| Owner: | State Highway Agency [01] |
| Year built: | 1935 |
| Year reconstructed: | 2004 |
| Historic significance: | Bridge is possibly eligible for the National Register of Historic Places [3] |
| Design load: | MS 18 / HS 20 [5] |
| Number of main spans: | 2 |
| Main spans material: | Concrete [1] |
| Main spans design: | Arch - Deck [11] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Bituminous [6] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 8,100 [as of 2007] |
| Truck traffic: | 1% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Very Good [8 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
| Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
| Operating rating: | 63.9 tons [58.1 metric tons] |
| Inventory rating: | 38.9 tons [35.4 metric tons] |
| Sufficiency rating: | 74.0 |
| Recommended work: | Other structural work, including hydraulic replacements. [38] |
| Estimated cost of work: | $4,449,000 |
2000 Inspection
| Status: | Posted for load [P] |
| Average daily traffic: | 15,700 [as of 1992] |
| Truck traffic: | 1% of total traffic |
| Deck condition: | Fair [5 out of 9] |
| Superstructure condition: | Poor [4 out of 9] |
| Substructure condition: | Fair [5 out of 9] |
| Channel protection: | Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6] |
| Scour condition: | Scour calculation/evaluation has not been made. [6] |
| Operating rating: | 63.9 tons [58.1 metric tons] |
| Inventory rating: | 38.9 tons [35.4 metric tons] |
| Evaluation: | Structurally deficient [1] |
| Sufficiency rating: | 45.3 |
| Recommended work: | Other structural work, including hydraulic replacements. [38] |
| Estimated cost of work: | $4,449,000 |
1992 Inspection
| Status: | Posted for load [P] |
| Average daily traffic: | 15,700 [as of 1990] |
| Truck traffic: | 1% of total traffic |
| Deck condition: | Serious [3 out of 9] |
| Superstructure condition: | Serious [3 out of 9] |
| Substructure condition: | Fair [5 out of 9] |
| Scour condition: | Scour calculation/evaluation has not been made. [6] |
| Operating rating: | 24.8 tons [22.5 metric tons] |
| Inventory rating: | 24.8 tons [22.5 metric tons] |
| Evaluation: | Structurally deficient [1] |
| Sufficiency rating: | 7.3 |
| Recommended work: | Other structural work, including hydraulic replacements. [38] |
| Estimated cost of work: | $4,449,000 |