Share:

SE FREEWAY over 11TH ST,SE, SE FWY RA &

Map 

Coordinates:
+38.87727, -76.99153
38°52'38" N, 76°59'30" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:SE FREEWAY over 11TH ST,SE, SE FWY RA &
Structure number:1405(RAMP WS)
Location:SE FRWY & 11TH ST S.E.
Purpose:Carries highway overpass (third level) over highway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:131.9 ft. [40.2 m]
Total length:1319.9 ft. [402.3 m]
Roadway width between curbs:28.9 ft. [8.8 m]
Deck width edge-to-edge:33.5 ft. [10.2 m]
Vertical clearance below bridge:14.8 ft. [4.5 m]
Owner:State Highway Agency [01]
Year built:1970
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:13
Main spans material:Steel [3]
Main spans design:Box beam or girders - Multiple [05]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:10,000 [as of 1992]
Truck traffic:5% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Fair [5 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:61.9 tons [56.3 metric tons]
Inventory rating:37.0 tons [33.6 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:62.7
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$1,200,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:10,000 [as of 1992]
Truck traffic:5% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:61.9 tons [56.3 metric tons]
Inventory rating:37.0 tons [33.6 metric tons]
Sufficiency rating:67.9
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$1,200,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:10,000 [as of 1990]
Truck traffic:5% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:35.6 tons [32.4 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:60.6
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$1,200,000