Share:

SOUTHEAST FREEWAY over M ST & 11TH ST S.E.

Map 

Coordinates:
+38.87794, -76.99152
38°52'41" N, 76°59'29" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:SOUTHEAST FREEWAY over M ST & 11TH ST S.E.
Structure number:1407(ROAD SW)
Location:SE FREEWAY & 11TH ST
Purpose:Carries highway overpass (third level) over highway and railroad
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:136.2 ft. [41.5 m]
Total length:1182.1 ft. [360.3 m]
Roadway width between curbs:28.9 ft. [8.8 m]
Deck width edge-to-edge:33.5 ft. [10.2 m]
Vertical clearance below bridge:14.8 ft. [4.5 m]
Owner:State Highway Agency [01]
Year built:1970
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:11
Main spans material:Steel [3]
Main spans design:Box beam or girders - Multiple [05]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:20,000 [as of 1996]
Truck traffic:4% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:69.9 tons [63.5 metric tons]
Inventory rating:41.9 tons [38.1 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:60.4
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$1,050,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:20,000 [as of 1996]
Truck traffic:4% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:69.9 tons [63.5 metric tons]
Inventory rating:41.9 tons [38.1 metric tons]
Sufficiency rating:65.8
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$1,050,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:20,000 [as of 1990]
Truck traffic:4% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:35.6 tons [32.4 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:70.0
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$1,050,000