SOUTHEAST FREEWAY over M ST & 11TH ST S.E.
Map
Coordinates:
+38.87794, -76.9915238°52'41" N, 76°59'29" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | SOUTHEAST FREEWAY over M ST & 11TH ST S.E. |
| Structure number: | 1407(ROAD SW) |
| Location: | SE FREEWAY & 11TH ST |
| Purpose: | Carries highway overpass (third level) over highway and railroad |
| Route classification: | Principal Arterial - Interstate (Urban) [11] |
| Length of largest span: | 136.2 ft. [41.5 m] |
| Total length: | 1182.1 ft. [360.3 m] |
| Roadway width between curbs: | 28.9 ft. [8.8 m] |
| Deck width edge-to-edge: | 33.5 ft. [10.2 m] |
| Vertical clearance below bridge: | 14.8 ft. [4.5 m] |
| Owner: | State Highway Agency [01] |
| Year built: | 1970 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18 / HS 20 [5] |
| Number of main spans: | 11 |
| Main spans material: | Steel [3] |
| Main spans design: | Box beam or girders - Multiple [05] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Bituminous [6] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 20,000 [as of 1996] |
| Truck traffic: | 4% of total traffic |
| Deck condition: | Fair [5 out of 9] |
| Superstructure condition: | Fair [5 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 69.9 tons [63.5 metric tons] |
| Inventory rating: | 41.9 tons [38.1 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 60.4 |
| Recommended work: | Other structural work, including hydraulic replacements. [38] |
| Estimated cost of work: | $1,050,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 20,000 [as of 1996] |
| Truck traffic: | 4% of total traffic |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Fair [5 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 69.9 tons [63.5 metric tons] |
| Inventory rating: | 41.9 tons [38.1 metric tons] |
| Sufficiency rating: | 65.8 |
| Recommended work: | Other structural work, including hydraulic replacements. [38] |
| Estimated cost of work: | $1,050,000 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 20,000 [as of 1990] |
| Truck traffic: | 4% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 35.6 tons [32.4 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 70.0 |
| Recommended work: | Other structural work, including hydraulic replacements. [38] |
| Estimated cost of work: | $1,050,000 |