Share:

DEL 896, US71,301S over C&D CANAL

Map 

Coordinates:
+39.53991, -75.73822
39°32'24" N, 75°44'18" W
Source: National Bridge Inventory (2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:DEL 896, US71,301S over C&D CANAL
Structure number:000000001494016
Location:9 MI W OF REEDY POINT
Purpose:Carries highway over waterway
Route classification:Principal Arterial - Other (Rural) [02]
Length of largest span:600.1 ft. [182.9 m]
Total length:2058.2 ft. [627.3 m]
Roadway width between curbs:58.7 ft. [17.9 m]
Deck width edge-to-edge:64.0 ft. [19.5 m]
Vertical clearance above deck:16.1 ft. [4.9 m]
Vertical clearance below bridge:133.9 ft. [40.8 m]
Owner:Corps of Engineers (Civil) [70]
Year built:1959
Year reconstructed:1987
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:3
Main spans material:Steel [3]
Main spans design:Truss - Thru [10]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:24,861 [as of 2008]
Truck traffic:25% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Pier/abutment protection:None present but re-evaluation suggested [5]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:61.8 tons [56.2 metric tons]
Inventory rating:37.0 tons [33.6 metric tons]
Sufficiency rating:70.7
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$13,123,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:21,363 [as of 1996]
Truck traffic:23% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Pier/abutment protection:None present but re-evaluation suggested [5]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:61.8 tons [56.2 metric tons]
Inventory rating:37.0 tons [33.6 metric tons]
Sufficiency rating:83.6
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$118,000