DEL 896, US71,301S over C&D CANAL
Map
Coordinates:
+39.53991, -75.7382239°32'24" N, 75°44'18" W
Source: National Bridge Inventory (2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | DEL 896, US71,301S over C&D CANAL |
| Structure number: | 000000001494016 |
| Location: | 9 MI W OF REEDY POINT |
| Purpose: | Carries highway over waterway |
| Route classification: | Principal Arterial - Other (Rural) [02] |
| Length of largest span: | 600.1 ft. [182.9 m] |
| Total length: | 2058.2 ft. [627.3 m] |
| Roadway width between curbs: | 58.7 ft. [17.9 m] |
| Deck width edge-to-edge: | 64.0 ft. [19.5 m] |
| Vertical clearance above deck: | 16.1 ft. [4.9 m] |
| Vertical clearance below bridge: | 133.9 ft. [40.8 m] |
| Owner: | Corps of Engineers (Civil) [70] |
| Year built: | 1959 |
| Year reconstructed: | 1987 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18 / HS 20 [5] |
| Number of main spans: | 3 |
| Main spans material: | Steel [3] |
| Main spans design: | Truss - Thru [10] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Monolithic Concrete (concurrently placed with structural deck) [1] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 24,861 [as of 2008] |
| Truck traffic: | 25% of total traffic |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Fair [5 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Channel protection: | Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8] |
| Pier/abutment protection: | None present but re-evaluation suggested [5] |
| Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
| Operating rating: | 61.8 tons [56.2 metric tons] |
| Inventory rating: | 37.0 tons [33.6 metric tons] |
| Sufficiency rating: | 70.7 |
| Recommended work: | Bridge rehabilitation because of general structure deterioration or inadequate strength. [35] |
| Estimated cost of work: | $13,123,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 21,363 [as of 1996] |
| Truck traffic: | 23% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Channel protection: | Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8] |
| Pier/abutment protection: | None present but re-evaluation suggested [5] |
| Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
| Operating rating: | 61.8 tons [56.2 metric tons] |
| Inventory rating: | 37.0 tons [33.6 metric tons] |
| Sufficiency rating: | 83.6 |
| Recommended work: | Other structural work, including hydraulic replacements. [38] |
| Estimated cost of work: | $118,000 |