Share:

SR 600 US 92 over CSX RR

Map 

Coordinates:
+27.99583, -82.39778
27°59'45" N, 82°23'52" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:SR 600 US 92 over CSX RR
Structure number:100021
Location:0.3MI WEST OF SR 583
Purpose:Carries highway and pedestrian walkway over railroad
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:59.1 ft. [18.0 m]
Total length:167.3 ft. [51.0 m]
Roadway width between curbs:62.3 ft. [19.0 m]
Deck width edge-to-edge:70.5 ft. [21.5 m]
Vertical clearance below bridge:21.3 ft. [6.5 m]
Skew angle:41°
Owner:State Highway Agency [01]
Year built:1936
Year reconstructed:1954
Historic significance:Bridge is possibly eligible for the National Register of Historic Places [3]
Design load:M 18 / H 20 [4]
Number of main spans:3
Main spans material:Steel [3]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:48,500 [as of 2008]
Truck traffic:5% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:51.9 tons [47.2 metric tons]
Inventory rating:31.9 tons [29.0 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:86.6

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:38,500 [as of 1998]
Truck traffic:15% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:51.8 tons [47.1 metric tons]
Inventory rating:31.9 tons [29.0 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:85.1

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:37,290 [as of 1988]
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:51.5 tons [46.8 metric tons]
Inventory rating:42.6 tons [38.7 metric tons]
Sufficiency rating:71.8
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$5,229,000