US 301 NB (SR 43) over TAMPA BYPASS CANAL
Map
Coordinates:
+27.97556, -82.3600027°58'32" N, 82°21'36" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | US 301 NB (SR 43) over TAMPA BYPASS CANAL |
| Structure number: | 100103 |
| Location: | 2.0MI NORTH OF SR 60 |
| Purpose: | Carries highway over waterway |
| Route classification: | Other Principal Arterial (Urban) [14] |
| Length of largest span: | 42.7 ft. [13.0 m] |
| Total length: | 675.2 ft. [205.8 m] |
| Roadway width between curbs: | 40.0 ft. [12.2 m] |
| Deck width edge-to-edge: | 42.3 ft. [12.9 m] |
| Skew angle: | 42° |
| Owner: | State Highway Agency [01] |
| Year built: | 1972 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18+Mod / HS 20+Mod [6] |
| Number of main spans: | 15 |
| Main spans material: | Prestressed concrete [5] |
| Main spans design: | Stringer/Multi-beam or girder [02] |
| Deck type: | Concrete Cast-in-Place [1] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 19,000 [as of 2008] |
| Truck traffic: | 10% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
| Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
| Operating rating: | 55.9 tons [50.8 metric tons] |
| Inventory rating: | 49.9 tons [45.4 metric tons] |
| Sufficiency rating: | 96.1 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 16,000 [as of 1998] |
| Truck traffic: | 15% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
| Scour condition: | Bridge with "unknown" foundation that has not been evaluated for scour. [U] |
| Operating rating: | 55.9 tons [50.8 metric tons] |
| Inventory rating: | 49.8 tons [45.3 metric tons] |
| Sufficiency rating: | 96.3 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 13,181 [as of 1988] |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Very Good [8 out of 9] |
| Substructure condition: | Very Good [8 out of 9] |
| Channel protection: | Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8] |
| Scour condition: | Scour calculation/evaluation has not been made. [6] |
| Operating rating: | 55.4 tons [50.4 metric tons] |
| Inventory rating: | 49.5 tons [45.0 metric tons] |
| Sufficiency rating: | 97.0 |