Share:

US 301 NB (SR 43) over TAMPA BYPASS CANAL

Map 

Coordinates:
+27.97556, -82.36000
27°58'32" N, 82°21'36" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:US 301 NB (SR 43) over TAMPA BYPASS CANAL
Structure number:100103
Location:2.0MI NORTH OF SR 60
Purpose:Carries highway over waterway
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:42.7 ft. [13.0 m]
Total length:675.2 ft. [205.8 m]
Roadway width between curbs:40.0 ft. [12.2 m]
Deck width edge-to-edge:42.3 ft. [12.9 m]
Skew angle:42°
Owner:State Highway Agency [01]
Year built:1972
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18+Mod / HS 20+Mod [6]
Number of main spans:15
Main spans material:Prestressed concrete [5]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:19,000 [as of 2008]
Truck traffic:10% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:55.9 tons [50.8 metric tons]
Inventory rating:49.9 tons [45.4 metric tons]
Sufficiency rating:96.1

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:16,000 [as of 1998]
Truck traffic:15% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge with "unknown" foundation that has not been evaluated for scour. [U]
Operating rating:55.9 tons [50.8 metric tons]
Inventory rating:49.8 tons [45.3 metric tons]
Sufficiency rating:96.3

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:13,181 [as of 1988]
Deck condition:Good [7 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:55.4 tons [50.4 metric tons]
Inventory rating:49.5 tons [45.0 metric tons]
Sufficiency rating:97.0