I 275 over HILLSBOROUGH RIVER
Map
Coordinates:
+27.95611, -82.4647227°57'22" N, 82°27'53" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | I 275 over HILLSBOROUGH RIVER |
| Structure number: | 100135 |
| Location: | 1.2 MI W OF I 275 I 4 INT |
| Purpose: | Carries highway over highway and waterway |
| Route classification: | Principal Arterial - Interstate (Urban) [11] |
| Length of largest span: | 104.3 ft. [31.8 m] |
| Total length: | 905.9 ft. [276.1 m] |
| Roadway width between curbs: | 64.0 ft. [19.5 m] |
| Deck width edge-to-edge: | 82.7 ft. [25.2 m] |
| Vertical clearance above deck: | 17.7 ft. [5.4 m] |
| Vertical clearance below bridge: | 39.7 ft. [12.1 m] |
| Skew angle: | 99° |
| Owner: | State Highway Agency [01] |
| Year built: | 1964 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18+Mod / HS 20+Mod [6] |
| Number of main spans: | 11 |
| Main spans material: | Prestressed concrete [5] |
| Main spans design: | Stringer/Multi-beam or girder [02] |
| Deck type: | Concrete Cast-in-Place [1] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 102,000 [as of 2008] |
| Truck traffic: | 4% of total traffic |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
| Pier/abutment protection: | In place and functioning [2] |
| Scour condition: | Bridge foundations determined to be stable for assessed or calculated scour condition. [5] |
| Operating rating: | 58.9 tons [53.5 metric tons] |
| Inventory rating: | 51.9 tons [47.2 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 84.9 |
| Recommended work: | Other structural work, including hydraulic replacements. [38] |
| Estimated cost of work: | $114,000 |
2000 Inspection
| Average daily traffic: | 1,500 [as of 1999] |
| Truck traffic: | 1% of total traffic |
| Evaluation: | Not applicable [N] |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 72,059 [as of 1988] |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Very Good [8 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Channel protection: | Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8] |
| Pier/abutment protection: | In place and functioning [2] |
| Scour condition: | Scour calculation/evaluation has not been made. [6] |
| Operating rating: | 58.4 tons [53.1 metric tons] |
| Inventory rating: | 51.5 tons [46.8 metric tons] |
| Sufficiency rating: | 73.1 |
| Recommended work: | Other structural work, including hydraulic replacements. [38] |
| Estimated cost of work: | $490,000 |