I 275 over 7TH AVENUE
Map
Coordinates:
+27.96028, -82.4544427°57'37" N, 82°27'16" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | I 275 over 7TH AVENUE |
| Structure number: | 100142 |
| Location: | 0.5 MI EAST SR 685 BUS 41 |
| Purpose: | Carries highway over highway |
| Route classification: | Principal Arterial - Interstate (Urban) [11] |
| Length of largest span: | 63.7 ft. [19.4 m] |
| Total length: | 164.7 ft. [50.2 m] |
| Roadway width between curbs: | 95.1 ft. [29.0 m] |
| Deck width edge-to-edge: | 100.1 ft. [30.5 m] |
| Vertical clearance below bridge: | 14.4 ft. [4.4 m] |
| Skew angle: | 30° |
| Owner: | State Highway Agency [01] |
| Year built: | 1964 |
| Year reconstructed: | 2005 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18+Mod / HS 20+Mod [6] |
| Number of main spans: | 3 |
| Main spans material: | Prestressed concrete [5] |
| Main spans design: | Stringer/Multi-beam or girder [02] |
| Deck type: | Concrete Cast-in-Place [1] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 100,500 [as of 2008] |
| Truck traffic: | 5% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Very Good [8 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 69.7 tons [63.4 metric tons] |
| Inventory rating: | 44.6 tons [40.5 metric tons] |
| Sufficiency rating: | 86.9 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 30,500 [as of 1994] |
| Truck traffic: | 30% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Very Good [8 out of 9] |
| Substructure condition: | Very Good [8 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 56.1 tons [51.0 metric tons] |
| Inventory rating: | 49.5 tons [45.0 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 86.4 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 70,081 [as of 1988] |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Very Good [8 out of 9] |
| Substructure condition: | Very Good [8 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 65.3 tons [59.4 metric tons] |
| Inventory rating: | 57.4 tons [52.2 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 82.0 |