SR 574 M.L. KING over HILLSBOROUGH RIVER
Map
Coordinates:
+27.98139, -82.4766727°58'53" N, 82°28'36" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | SR 574 M.L. KING over HILLSBOROUGH RIVER |
| Structure number: | 100500 |
| Location: | 1.3 MILE W I 275 |
| Purpose: | Carries highway and pedestrian walkway over highway and waterway |
| Route classification: | Other Principal Arterial (Urban) [14] |
| Length of largest span: | 110.6 ft. [33.7 m] |
| Total length: | 872.4 ft. [265.9 m] |
| Roadway width between curbs: | 42.3 ft. [12.9 m] |
| Deck width edge-to-edge: | 54.1 ft. [16.5 m] |
| Vertical clearance below bridge: | 35.8 ft. [10.9 m] |
| Skew angle: | 40° |
| Owner: | State Highway Agency [01] |
| Year built: | 1960 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18 / HS 20 [5] |
| Number of main spans: | 3 |
| Main spans material: | Steel continuous [4] |
| Main spans design: | Stringer/Multi-beam or girder [02] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Monolithic Concrete (concurrently placed with structural deck) [1] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 36,500 [as of 2008] |
| Truck traffic: | 2% of total traffic |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
| Pier/abutment protection: | In place and functioning [2] |
| Scour condition: | Bridge with "unknown" foundation that has not been evaluated for scour. [U] |
| Operating rating: | 70.8 tons [64.4 metric tons] |
| Inventory rating: | 41.9 tons [38.1 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 70.2 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 37,000 [as of 1996] |
| Truck traffic: | 20% of total traffic |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
| Pier/abutment protection: | In place and functioning [2] |
| Scour condition: | Bridge over "tidal" waters that has not been evaluated for scour, but considered low risk. [T] |
| Operating rating: | 70.8 tons [64.4 metric tons] |
| Inventory rating: | 41.9 tons [38.1 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 72.2 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 34,247 [as of 1988] |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Channel protection: | Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6] |
| Pier/abutment protection: | In place but in a deteriorated condition [3] |
| Scour condition: | Scour calculation/evaluation has not been made. [6] |
| Operating rating: | 70.3 tons [63.9 metric tons] |
| Inventory rating: | 41.6 tons [37.8 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 71.2 |
| Recommended work: | Bridge rehabilitation because of general structure deterioration or inadequate strength. [35] |
| Estimated cost of work: | $674,000 |