Facts 

Name:SR-115 SB over RIBAULT RIVER
Structure number:720032
Location:SR-115 OVER RIBAULT RIVER
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Minor Arterial (Urban) [16]
Length of largest span:61.0 ft. [18.6 m]
Total length:747.1 ft. [227.7 m]
Roadway width between curbs:27.9 ft. [8.5 m]
Deck width edge-to-edge:38.1 ft. [11.6 m]
Vertical clearance below bridge:21.0 ft. [6.4 m]
Owner:State Highway Agency [01]
Year built:1961
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:18
Main spans material:Prestressed concrete [5]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]

Latest Available Inspection: October 2014 

Status:Open, no restriction [A]
Average daily traffic:15,000 [as of 2013]
Truck traffic:2% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Structural appraisal:Equal to present minimum criteria [6]
Deck geometry appraisal:Basically intolerable requiring high priority of corrrective action [3]
Water adequacy appraisal:Equal to present desirable criteria [8]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Pier/abutment protection:In place and functioning [2]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Operating rating:71.8 tons [65.3 metric tons]
Inventory rating:44.9 tons [40.8 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:78.2
Recommended work:Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Estimated cost of work:$1,506,000

Previous Inspections 

DateSuff. ratingEvaluationDeckSuper.Sub.ADT
October 201478.2Functionally obsoleteGoodGoodSatisfactory15000
October 201278.3Functionally obsoleteGoodGoodSatisfactory14500
October 201078.2Functionally obsoleteGoodGoodSatisfactory15000
October 200878.1Functionally obsoleteGoodGoodSatisfactory15750
October 200678.0Functionally obsoleteGoodGoodSatisfactory16250
October 200478.2Functionally obsoleteGoodGoodSatisfactory14750
October 200279.0Functionally obsoleteGoodGoodSatisfactory16250
October 200079.1Functionally obsoleteGoodGoodSatisfactory15000
November 199880.1Functionally obsoleteGoodVery GoodGood15000
November 199679.3Functionally obsoleteGoodVery GoodGood14250
December 199476.6Functionally obsoleteGoodVery GoodGood14000
November 199276.7Functionally obsoleteGoodVery GoodGood13203
January 199176.7Functionally obsoleteGoodVery GoodGood13900