SR-10 E.B. over SAN PABLO RIVER (IWW)

Map 

Coordinates:
+30.32333, -81.43917
30°19'24" N, 81°26'21" W
Source: National Bridge Inventory
Information not verified. Use at your own risk.

Facts 

Name:SR-10 E.B. over SAN PABLO RIVER (IWW)
Structure number:720044
Location:SR-10 EB/San Pablo River
Purpose:Carries highway over highway and waterway
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:129.9 ft. [39.6 m]
Total length:2350.2 ft. [716.3 m]
Roadway width between curbs:55.8 ft. [17.0 m]
Deck width edge-to-edge:59.1 ft. [18.0 m]
Vertical clearance below bridge:65.0 ft. [19.8 m]
Owner:State Highway Agency [01]
Year built:1965
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 18 / H 20 [4]
Number of main spans:3
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]

Latest Available Inspection: November 2015 

Status:Open, no restriction [A]
Average daily traffic:23,500 [as of 2014]
Truck traffic:2% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Structural appraisal:Equal to present minimum criteria [6]
Deck geometry appraisal:Superior to present desirable criteria [9]
Underclearances appraisal:Superior to present desirable criteria [9]
Water adequacy appraisal:Superior to present desirable criteria [9]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5]
Pier/abutment protection:In place but in a deteriorated condition [3]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Operating rating:56.1 tons [51.0 metric tons]
Inventory rating:33.7 tons [30.6 metric tons]
Sufficiency rating:90.3
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$48,000

Previous Inspections 

DateSuff. ratingEvaluationDeckSuper.Sub.ADT
November 201590.3Not deficientGoodSatisfactorySatisfactory23500
November 201390.6Not deficientGoodSatisfactorySatisfactory22750
November 201191.5Not deficientGoodSatisfactorySatisfactory22750
November 200991.2Not deficientGoodSatisfactorySatisfactory23500
November 200797.5Not deficientGoodGoodSatisfactory26250
November 200597.5Not deficientGoodGoodSatisfactory27250
November 200398.4Not deficientGoodGoodSatisfactory29750
December 200194.6Not deficientGoodGoodSatisfactory31000
February 200063.1Not deficientGoodGoodSatisfactory48500
February 199863.1Not deficientGoodGoodSatisfactory55000
January 199651.9Not deficientGoodGoodFair54000
February 199460.9Not deficientGoodGoodSatisfactory48444
March 199260.9Not deficientGoodSatisfactorySatisfactory48444
May 199060.9Not deficientGoodSatisfactorySatisfactory46995