SR-105 (SIMPSON) over SIMPSON CREEK

Map 

Coordinates:
+30.46333, -81.43167
30°27'48" N, 81°25'54" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:SR-105 (SIMPSON) over SIMPSON CREEK
Structure number:720072
Location:SR-105 OVER SIMPSON CREEK
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Minor Arterial (Rural) [06]
Length of largest span:20.0 ft. [6.1 m]
Total length:100.1 ft. [30.5 m]
Roadway width between curbs:23.6 ft. [7.2 m]
Deck width edge-to-edge:28.9 ft. [8.8 m]
Owner:State Highway Agency [01]
Year built:1949
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 13.5 / H 15 [2]
Number of main spans:5
Main spans material:Steel [3]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:3,300 [as of 2008]
Truck traffic:7% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5]
Scour condition:Bridge is scour critical; bridge foundations determined to be unstable. [3]
Operating rating:48.8 tons [44.4 metric tons]
Inventory rating:29.9 tons [27.2 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:77.1
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$51,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:4,156 [as of 1998]
Truck traffic:10% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge with "unknown" foundation that has not been evaluated for scour. [U]
Operating rating:48.8 tons [44.4 metric tons]
Inventory rating:29.9 tons [27.2 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:64.2
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$51,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:1,320 [as of 1989]
Truck traffic:5% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:48.5 tons [44.1 metric tons]
Inventory rating:29.7 tons [27.0 metric tons]
Sufficiency rating:72.9
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,265,000