Facts 

Name:SR-228A WB over LITTLE POTTSBURG CREEK
Structure number:720109
Location:SR-228A/ LITTLE POTTSBURG
Purpose:Carries highway over waterway
Route classification:Principal Arterial - Other Freeways or Expressways (Urban) [12]
Length of largest span:60.0 ft. [18.3 m]
Total length:180.1 ft. [54.9 m]
Roadway width between curbs:30.2 ft. [9.2 m]
Deck width edge-to-edge:35.1 ft. [10.7 m]
Vertical clearance below bridge:24.0 ft. [7.3 m]
Skew angle:99°
Owner:State Highway Agency [01]
Year built:1967
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18+Mod / HS 20+Mod [6]
Number of main spans:3
Main spans material:Prestressed concrete [5]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]

Latest Available Inspection: October 2015 

Status:Open, no restriction [A]
Average daily traffic:7,400 [as of 2014]
Truck traffic:2% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Structural appraisal:Better than present minimum criteria [7]
Deck geometry appraisal:Basically intolerable requiring high priority of replacement [2]
Water adequacy appraisal:Equal to present desirable criteria [8]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:55.9 tons [50.8 metric tons]
Inventory rating:34.9 tons [31.7 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:78.4
Recommended work:Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Estimated cost of work:$320,000

Previous Inspections 

DateSuff. ratingEvaluationDeckSuper.Sub.ADT
October 201578.4Functionally obsoleteGoodGoodGood7400
October 201378.4Functionally obsoleteGoodGoodGood6900
October 201178.4Functionally obsoleteGoodGoodGood6400
October 200978.4Functionally obsoleteGoodGoodGood6751
October 200778.4Functionally obsoleteGoodGoodGood6750
October 200578.4Functionally obsoleteGoodGoodGood6500
October 200377.4Functionally obsoleteGoodGoodGood6500
October 200177.1Functionally obsoleteGoodGoodGood12000
November 199977.2Functionally obsoleteGoodGoodGood10500
November 199776.6Functionally obsoleteGoodGoodGood9300
November 199576.5Functionally obsoleteGoodVery GoodGood12200
October 199377.7Functionally obsoleteGoodVery GoodVery Good10565
December 199177.9Functionally obsoleteVery GoodVery GoodVery Good8765