Share:

I-295 SB (SR-9A) over SR-21

Map 

Coordinates:
+30.19639, -81.73917
30°11'47" N, 81°44'21" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:I-295 SB (SR-9A) over SR-21
Structure number:720248
Location:I-295 SB OVER SR-21
Purpose:Carries highway over highway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:83.0 ft. [25.3 m]
Total length:254.9 ft. [77.7 m]
Roadway width between curbs:56.1 ft. [17.1 m]
Deck width edge-to-edge:58.7 ft. [17.9 m]
Vertical clearance below bridge:15.1 ft. [4.6 m]
Skew angle:24°
Owner:State Highway Agency [01]
Year built:1969
Year reconstructed:1994
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18+Mod / HS 20+Mod [6]
Number of main spans:4
Main spans material:Prestressed concrete [5]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:50,000 [as of 2008]
Truck traffic:8% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:55.9 tons [50.8 metric tons]
Inventory rating:33.9 tons [30.8 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:93.3

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:38,000 [as of 1996]
Truck traffic:10% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:58.9 tons [53.5 metric tons]
Inventory rating:33.9 tons [30.8 metric tons]
Sufficiency rating:95.3

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:28,920 [as of 1989]
Truck traffic:10% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Good [7 out of 9]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge not over waterway. [N]
Operating rating:52.5 tons [47.7 metric tons]
Inventory rating:36.6 tons [33.3 metric tons]
Sufficiency rating:93.0