I-295 SB (BUCKMAN) over ST. JOHNS RIVER

Map 

Coordinates:
+30.19028, -81.66528
30°11'25" N, 81°39'55" W
Source: National Bridge Inventory
Information not verified. Use at your own risk.

Facts 

Name:I-295 SB (BUCKMAN) over ST. JOHNS RIVER
Structure number:720249
Location:I-295 OVER ST.JOHNS RIVER
Purpose:Carries highway over waterway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:250.0 ft. [76.2 m]
Total length:16301.0 ft. [4968.3 m]
Roadway width between curbs:67.9 ft. [20.7 m]
Deck width edge-to-edge:71.2 ft. [21.7 m]
Vertical clearance above deck:18.0 ft. [5.5 m]
Vertical clearance below bridge:65.0 ft. [19.8 m]
Owner:State Highway Agency [01]
Year built:1970
Year reconstructed:1995
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:3
Main spans material:Steel [3]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]

Latest Available Inspection: April 2015 

Status:Open, no restriction [A]
Average daily traffic:62,750 [as of 2014]
Truck traffic:11% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Structural appraisal:Equal to present minimum criteria [6]
Deck geometry appraisal:Equal to present minimum criteria [6]
Water adequacy appraisal:Equal to present desirable criteria [8]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Pier/abutment protection:In place and functioning [2]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Operating rating:42.5 tons [38.6 metric tons]
Inventory rating:32.8 tons [29.8 metric tons]
Sufficiency rating:90.7
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$839,000

Previous Inspections 

DateSuff. ratingEvaluationDeckSuper.Sub.ADT
April 201590.7Not deficientSatisfactorySatisfactorySatisfactory62750
April 201390.7Not deficientSatisfactorySatisfactorySatisfactory62500
April 201190.9Not deficientSatisfactorySatisfactorySatisfactory60750
April 200992.1Not deficientSatisfactorySatisfactorySatisfactory62500
April 200791.9Not deficientSatisfactorySatisfactorySatisfactory64750
April 200591.9Not deficientSatisfactoryGoodSatisfactory54500
May 200392.8Not deficientSatisfactoryGoodSatisfactory56000
June 200185.0Not deficientSatisfactoryGoodSatisfactory57750
May 199985.0Not deficientSatisfactoryGoodSatisfactory55500
May 199782.8Not deficientSatisfactoryGoodFair39000
May 199577.5Not deficientSatisfactoryGoodSatisfactory37250
August 199365.7Not deficientSatisfactoryGoodFair38227
October 199177.4Not deficientSatisfactoryGoodSatisfactory38227