Share:

I-95 NB (SR-9) over NASSAU RIVER

Map 

Coordinates:
+30.57556, -81.64583
30°34'32" N, 81°38'45" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:I-95 NB (SR-9) over NASSAU RIVER
Structure number:720336
Location:I-95 NB / NASSAU RIVER
Purpose:Carries highway over waterway
Route classification:Principal Arterial - Interstate (Rural) [01]
Length of largest span:47.9 ft. [14.6 m]
Total length:624.0 ft. [190.2 m]
Roadway width between curbs:56.1 ft. [17.1 m]
Deck width edge-to-edge:58.7 ft. [17.9 m]
Vertical clearance below bridge:7.9 ft. [2.4 m]
Owner:State Highway Agency [01]
Year built:1967
Year reconstructed:1992
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18+Mod / HS 20+Mod [6]
Number of main spans:13
Main spans material:Prestressed concrete [5]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:29,750 [as of 2008]
Truck traffic:14% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge is scour critical; bridge foundations determined to be unstable. [3]
Operating rating:69.6 tons [63.3 metric tons]
Inventory rating:41.8 tons [38.0 metric tons]
Sufficiency rating:95.2
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$425,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:22,000 [as of 1998]
Truck traffic:18% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Fair [5 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge is scour critical; bridge foundations determined to be unstable. [3]
Operating rating:55.9 tons [50.8 metric tons]
Inventory rating:37.8 tons [34.4 metric tons]
Sufficiency rating:85.8
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$425,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:21,445 [as of 1991]
Truck traffic:18% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:55.4 tons [50.4 metric tons]
Inventory rating:37.6 tons [34.2 metric tons]
Sufficiency rating:78.0