SR-103 (LANE AVE.) over CEDAR RIVER
Map
Coordinates:
+30.29667, -81.7516730°17'48" N, 81°45'06" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | SR-103 (LANE AVE.) over CEDAR RIVER |
| Structure number: | 720402 |
| Location: | 1.32 MI. N. OF SAN JUAN |
| Purpose: | Carries highway and pedestrian walkway over waterway |
| Route classification: | Minor Arterial (Urban) [16] |
| Length of largest span: | 38.1 ft. [11.6 m] |
| Total length: | 109.9 ft. [33.5 m] |
| Roadway width between curbs: | 64.0 ft. [19.5 m] |
| Deck width edge-to-edge: | 76.1 ft. [23.2 m] |
| Owner: | State Highway Agency [01] |
| Year built: | 1975 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18 / HS 20 [5] |
| Number of main spans: | 3 |
| Main spans material: | Prestressed concrete [5] |
| Main spans design: | Stringer/Multi-beam or girder [02] |
| Deck type: | Concrete Cast-in-Place [1] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 19,400 [as of 2008] |
| Truck traffic: | 2% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Very Good [8 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
| Scour condition: | Bridge with "unknown" foundation that has not been evaluated for scour. [U] |
| Operating rating: | 58.9 tons [53.5 metric tons] |
| Inventory rating: | 42.9 tons [39.0 metric tons] |
| Sufficiency rating: | 93.3 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 16,500 [as of 1997] |
| Truck traffic: | 10% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Very Good [8 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
| Scour condition: | Bridge with "unknown" foundation that has not been evaluated for scour. [U] |
| Operating rating: | 58.9 tons [53.5 metric tons] |
| Inventory rating: | 42.9 tons [39.0 metric tons] |
| Sufficiency rating: | 91.0 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 21,545 [as of 1989] |
| Truck traffic: | 10% of total traffic |
| Deck condition: | Very Good [8 out of 9] |
| Superstructure condition: | Very Good [8 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Channel protection: | Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8] |
| Scour condition: | Scour calculation/evaluation has not been made. [6] |
| Operating rating: | 58.4 tons [53.1 metric tons] |
| Inventory rating: | 41.6 tons [37.8 metric tons] |
| Sufficiency rating: | 92.2 |