I-95 NB OFF RAMP over RIVERSIDE AVE.
Map
Coordinates:
+30.31694, -81.6763930°19'01" N, 81°40'35" W
Source: National Bridge Inventory (2010 edition)
Information not verified. Use at your own risk.
Facts
| Name: | I-95 NB OFF RAMP over RIVERSIDE AVE. |
| Structure number: | 720631 |
| Location: | I-95NB RAMP TO PARK ST |
| Purpose: | Carries highway over highway |
| Route classification: | Principal Arterial - Interstate (Urban) [11] |
| Length of largest span: | 141.1 ft. [43.0 m] |
| Total length: | 423.2 ft. [129.0 m] |
| Roadway width between curbs: | 30.8 ft. [9.4 m] |
| Deck width edge-to-edge: | 34.5 ft. [10.5 m] |
| Vertical clearance below bridge: | 38.4 ft. [11.7 m] |
| Owner: | State Highway Agency [01] |
| Year built: | 2003 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18+Mod / HS 20+Mod [6] |
| Number of main spans: | 3 |
| Main spans material: | Prestressed concrete [5] |
| Main spans design: | Stringer/Multi-beam or girder [02] |
| Deck type: | Concrete Cast-in-Place [1] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 7,800 [as of 2009] |
| Truck traffic: | 8% of total traffic |
| Deck condition: | Very Good [8 out of 9] |
| Superstructure condition: | Very Good [8 out of 9] |
| Substructure condition: | Very Good [8 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 93.8 tons [85.3 metric tons] |
| Inventory rating: | 56.9 tons [51.7 metric tons] |
| Sufficiency rating: | 97.8 |