HIGHWAY AVENUE over TRIB TO CEDAR RIVER

Map 

Coordinates:
+30.32139, -81.74778
30°19'17" N, 81°44'52" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:HIGHWAY AVENUE over TRIB TO CEDAR RIVER
Structure number:724041
Location:0.3 MI EAST OF LANE AVE
Purpose:Carries highway over waterway
Route classification:Local (Urban) [19]
Length of largest span:17.4 ft. [5.3 m]
Total length:65.0 ft. [19.8 m]
Roadway width between curbs:24.0 ft. [7.3 m]
Deck width edge-to-edge:25.6 ft. [7.8 m]
Owner:City or Municipal Highway Agency [04]
Year built:1959
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Number of main spans:4
Main spans material:Concrete [1]
Main spans design:Slab [01]
Deck type:Concrete Cast-in-Place [1]

2010 Inspection 

Status:Posted for load [P]
Average daily traffic:3,001 [as of 2008]
Truck traffic:10% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Serious [3 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge with "unknown" foundation that has not been evaluated for scour. [U]
Operating rating:27.9 tons [25.4 metric tons]
Inventory rating:16.9 tons [15.4 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:20.3
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$199,000

2000 Inspection 

Status: [-]
Average daily traffic:3,001 [as of 1999]
Truck traffic:10% of total traffic
Deck condition: [- out of 9]
Superstructure condition: [- out of 9]
Substructure condition: [- out of 9]
Operating rating:27.9 tons [25.4 metric tons]
Inventory rating:16.9 tons [15.4 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:55.3
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$199,000

1992 Inspection 

Status:Posted for load [P]
Average daily traffic:5,901 [as of 1991]
Truck traffic:10% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Fair [5 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:27.7 tons [25.2 metric tons]
Inventory rating:16.8 tons [15.3 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:42.7
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$178,000