Share:

BULLS BAY HIGHWAY over TRIB SIX MILE CREEK

Map 

Coordinates:
+30.36139, -81.79000
30°21'41" N, 81°47'24" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:BULLS BAY HIGHWAY over TRIB SIX MILE CREEK
Structure number:724066
Location:1.1M N OF COMMONWEALTHAVE
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Collector (Urban) [17]
Length of largest span:20.0 ft. [6.1 m]
Total length:40.0 ft. [12.2 m]
Roadway width between curbs:27.9 ft. [8.5 m]
Deck width edge-to-edge:38.1 ft. [11.6 m]
Owner:City or Municipal Highway Agency [04]
Year built:1951
Year reconstructed:1976
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Number of main spans:2
Main spans material:Concrete [1]
Main spans design:Slab [01]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:1,441 [as of 2008]
Truck traffic:5% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5]
Scour condition:Bridge with "unknown" foundation that has not been evaluated for scour. [U]
Operating rating:47.9 tons [43.5 metric tons]
Inventory rating:28.6 tons [26.0 metric tons]
Sufficiency rating:82.8
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$9,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:1,441 [as of 1998]
Truck traffic:5% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge is scour critical; bridge foundations determined to be unstable. [3]
Operating rating:47.7 tons [43.4 metric tons]
Inventory rating:25.3 tons [23.0 metric tons]
Sufficiency rating:80.7
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$9,000

1992 Inspection 

Status:Posted for load [P]
Average daily traffic:1,441 [as of 1992]
Truck traffic:5% of total traffic
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:35.6 tons [32.4 metric tons]
Inventory rating:20.8 tons [18.9 metric tons]
Sufficiency rating:67.1
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$9,000