Share:

SR-44 over US-1 & FECRR

Map 

Coordinates:
+29.02028, -80.92611
29°01'13" N, 80°55'34" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:SR-44 over US-1 & FECRR
Structure number:790128
Location:SR-44 over US-1
Purpose:Carries highway over highway and railroad
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:109.9 ft. [33.5 m]
Total length:718.9 ft. [219.1 m]
Roadway width between curbs:67.9 ft. [20.7 m]
Deck width edge-to-edge:70.5 ft. [21.5 m]
Vertical clearance below bridge:11.8 ft. [3.6 m]
Owner:State Highway Agency [01]
Year built:1980
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:8
Main spans material:Prestressed concrete [5]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:19,300 [as of 2008]
Truck traffic:3% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:81.1 tons [73.7 metric tons]
Inventory rating:48.6 tons [44.2 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:94.1
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$139,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:24,000 [as of 1998]
Truck traffic:4% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:81.4 tons [74.0 metric tons]
Inventory rating:48.8 tons [44.4 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:94.8
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$139,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:12,165 [as of 1988]
Truck traffic:1% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:55.4 tons [50.4 metric tons]
Inventory rating:47.5 tons [43.2 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:95.0
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$263,000