SR-112 WB over NW 32 AVE
Map
Coordinates:
+25.81194, -80.2486125°48'43" N, 80°14'55" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | SR-112 WB over NW 32 AVE |
| Structure number: | 870123 |
| Location: | 1 Mile W/O NW 22ND AVE |
| Purpose: | Carries highway over highway |
| Route classification: | Principal Arterial - Other Freeways or Expressways (Urban) [12] |
| Tolls: | Yes, on toll road [2] |
| Length of largest span: | 63.0 ft. [19.2 m] |
| Total length: | 142.7 ft. [43.5 m] |
| Roadway width between curbs: | 39.4 ft. [12.0 m] |
| Deck width edge-to-edge: | 45.9 ft. [14.0 m] |
| Vertical clearance below bridge: | 16.1 ft. [4.9 m] |
| Skew angle: | 6° |
| Owner: | State Toll Authority [31] |
| Year built: | 1960 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18 / HS 20 [5] |
| Number of main spans: | 3 |
| Main spans material: | Prestressed concrete [5] |
| Main spans design: | Stringer/Multi-beam or girder [02] |
| Deck type: | Concrete Cast-in-Place [1] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 49,000 [as of 2009] |
| Truck traffic: | 5% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 49.5 tons [45.0 metric tons] |
| Inventory rating: | 29.7 tons [27.0 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 67.6 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 52,000 [as of 1998] |
| Truck traffic: | 2% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 49.5 tons [45.0 metric tons] |
| Inventory rating: | 29.7 tons [27.0 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 66.3 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 19,270 [as of 1988] |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 53.5 tons [48.6 metric tons] |
| Inventory rating: | 47.5 tons [43.2 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 72.0 |
| Recommended work: | Widening of existing bridge with deck rehabilitation or replacement. [34] |
| Estimated cost of work: | $39,000 |