Share:

COMP SR-852 over FLORIDA TURNPIKE (SR-91)

Map 

Coordinates:
+25.97222, -80.22944
25°58'20" N, 80°13'46" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:COMP SR-852 over FLORIDA TURNPIKE (SR-91)
Structure number:870164
Location:0.88M W OF NW 7 AVE
Purpose:Carries highway over highway
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:82.0 ft. [25.0 m]
Total length:224.1 ft. [68.3 m]
Roadway width between curbs:77.4 ft. [23.6 m]
Deck width edge-to-edge:99.4 ft. [30.3 m]
Vertical clearance below bridge:15.4 ft. [4.7 m]
Owner:State Highway Agency [01]
Year built:1972
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:4
Main spans material:Prestressed concrete [5]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:25,500 [as of 2008]
Truck traffic:3% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:67.1 tons [61.0 metric tons]
Inventory rating:40.7 tons [37.0 metric tons]
Sufficiency rating:93.7

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:25,200 [as of 1997]
Deck condition:Very Good [8 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:90.2 tons [82.0 metric tons]
Inventory rating:53.9 tons [49.0 metric tons]
Sufficiency rating:93.7

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:28,398 [as of 1988]
Deck condition:Very Good [8 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:37.6 tons [34.2 metric tons]
Inventory rating:31.7 tons [28.8 metric tons]
Sufficiency rating:89.4
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$5,000