Share:

SR 821 HEFT 29.08 over NW 41 ST

Map 

Coordinates:
+25.81167, -80.38639
25°48'42" N, 80°23'11" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:SR 821 HEFT 29.08 over NW 41 ST
Structure number:870217
Location:16.3 MILES NORTH OF US-1
Purpose:Carries highway over highway
Route classification:Principal Arterial - Other Freeways or Expressways (Urban) [12]
Tolls:Yes, on toll road [2]
Length of largest span:85.3 ft. [26.0 m]
Total length:170.9 ft. [52.1 m]
Roadway width between curbs:55.1 ft. [16.8 m]
Deck width edge-to-edge:59.1 ft. [18.0 m]
Vertical clearance below bridge:16.4 ft. [5.0 m]
Owner:State Toll Authority [31]
Year built:1973
Year reconstructed:2001
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:2
Main spans material:Prestressed concrete [5]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:48,000 [as of 2008]
Truck traffic:7% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:88.7 tons [80.6 metric tons]
Inventory rating:55.3 tons [50.3 metric tons]
Sufficiency rating:93.4

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:24,500 [as of 1993]
Truck traffic:8% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:96.7 tons [87.9 metric tons]
Inventory rating:59.8 tons [54.4 metric tons]
Sufficiency rating:89.8

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:36,626 [as of 1988]
Deck condition:Very Good [8 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:48.5 tons [44.1 metric tons]
Inventory rating:41.6 tons [37.8 metric tons]
Sufficiency rating:94.3